Project Overview:

This project involved the rapid redesign and renovation of an existing pizzeria. The client, dissatisfied with the previous design, sought a fresh ambiance for the restaurant. Our firm was tasked with creating a new look within a tight budget and an extremely short timeframe, as the client wanted to minimize closure time and complete some changes while still operating.

Project Scope:


Project Summary: Client: Pizzeria owner
Scope: Interior redesign and renovation of an existing pizzeria
Key Objectives:
1. Create a new vibe for the restaurant
2. Work within a tight budget
3. Minimize closure time
4. Increase dine-in customers
Design Approach:
1. Focused on cost-effective, high-impact changes
2. Redecoration of walls with small but effective finishes
3. Updating lighting fixtures
4. Replacing loose furniture to match the new desired look
Challenges:
1. Tight budget constraints
2. Extremely short timeframe for renovation
3. Client's limited ability to visualize design concepts from technical drawings
Solutions:
1. Use of CGI (Computer-Generated Imagery) to help client visualize proposed changes
2. Phased approach, allowing some changes to be made while business resumed
Key Achievements:
1. Successful renovation completed within budget and time constraints
2. Increased number of dine-in customers post-renovation
3. High client satisfaction with the outcome
Outcome:
1. Transformed restaurant ambiance
2. Shift in customer behavior from primarily take-away to increased dine-in patronage
This project demonstrates our ability to work effectively under tight constraints, both in terms of budget and time. By focusing on high-impact, cost-effective changes and using CGI to communicate design concepts clearly, we were able to meet the client's needs and contribute to the improved performance of the business.








Plan your budget

How much could your project cost?

Use our free construction cost calculator to check a rough estimate of how much your extension, loft conversion, refurbishment or new-build project could cost. It is an early budgeting guide rather than a contractor quotation.

Go Back Top